Brown Davis for FORD RANGER PX 2011-On 145L Replacement Long Range Poly Fuel Tank
$1,300.00
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
SKU code: HC08R3
Izuzu D-Max (2008-2012)
The Izuzu D-Max Replacement Long Range Fuel Tank has been designed with off-road use in mind. The Brown Davis tank sits at the same height as the vehicles standard tank making sure your ground clearance and ramp over are not effected. Manufactured from 2mm Aluminized Steel combined with internal baffles gives the Brown Davis tank the extra strength required to withstand the worst impacts.
SKU | HC08R3 |
Brand | Brown Davis |
Shipping Weight | 40.0000kg |
Shipping Width | 1.180m |
Shipping Height | 0.680m |
Shipping Length | 0.440m |
Help other 4WD Industries users shop smarter by writing reviews for products you have purchased.
Brown Davis for FORD RANGER PX 2011-On 145L Replacement Long Range Poly Fuel Tank
$1,300.00
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
Brown Davis for FORD RANGER PX 2011-Present 125L Replacement Long Range Fuel Tank
$1,840.00
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
Brown Davis for LAND ROVER DEFENDER 110 TD5 72L Replacement Long Range Fuel Tank
$1,780.00
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
Brown Davis for LAND ROVER DISCOVERY 4 2009-On 110L Auxiliary Long Range Fuel Tank
$1,840.00
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
Brown Davis for FORD RANGER PX 2011-Present 140L Replacement Long Range Fuel Tank
$1,300.00
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
Brown Davis for ISUZU DMAX 2011-2020 133L Replacement Long Range Fuel Tank HCRGR1
$1,320.00
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
Brown Davis for FORD COURIER FEB-99 126L Replacement Long Range Fuel Tank
$1,430.00
Orders from Brown Davis may take up to 12 weeks to be fulfilled.
Brown Davis 142L Replacement Long Range Fuel Tank Land Rover Discovery 2 99-06 LDI2R1
$1,480.00
Orders from Brown Davis may take up to 12 weeks to be fulfilled.